OPEN TENDER– REQUEST FOR PROPOSALS (RFP)
| Tender Reference No.: | 003/PLI/PI/ICT/OT/2026/INF |
| Tender Type: | OPEN TENDER (Invitation to Specific Companies) |
| Tender Name: | Supply, Delivery & Installation of ICT Infrastructure: Server, Storage, Network Equipment & UPS |
| Issue Date: | 20/05/2026 |
| Closing Date & Time: | 29/05/2026 @ 15:30 |
| Contact for Clarifications: | Dieudonné UWAMBAJIMANA | dieudonne.uwambajimana@prime.rw | 0786 138 376 |
| Companies | PRIME LIFE INSURANCE LTD & PRIME INSURANCE LTD |
1. Background
Prime Life Insurance Ltd and Prime Insurance Ltd (hereinafter referred to as "the Companies") are regulated insurance companies based in Kigali, Rwanda. As part of an ongoing ICT infrastructure upgrade, the Companies invite eligible bidders to submit proposals for the supply, delivery, installation, and commissioning of a comprehensive set of ICT equipment and services.
The scope of supply includes one high-performance rack server and two dual-controller all-flash NVMe storage units, each with a minimum of 20 TB usable capacity configured in RAID 6, along with all connectivity accessories required to achieve a minimum host-to-storage throughput of 10 Gb/s. The networking infrastructure to be supplied comprises two Cisco MDS 9148S 16G Fibre Channel SAN switches, one Cisco Catalyst 1300-48P-4X managed switch, and one Cisco Catalyst 9300-48P-E managed switch. In addition, one 20 kVA online double-conversion UPS is required to ensure continuous power protection for the environment. Full on-site installation, configuration, and commissioning of all supplied equipment is included in the scope of work. All equipment must be new, genuine, and procured through an authorized reseller.
The new storage infrastructure will serve a total of three host servers: two existing Dell PowerEdge R750 servers already in operation at the Companies' premises, and the one new rack server to be supplied and commissioned under this tender.
2. Scope of Supply & Deliverables
Bidders must propose equivalent or superior products from one of the following approved brands:
DELL, HP, Huawei, Lenovo, Sisco
The complete scope covers:
- Component A – One (1) high-performance rack server fully configured per the BOM in Section 3.
- Component B – Two (2) dual-controller all-flash NVMe storage systems per the BOM in Section 4, each delivering ≥ 20 TB usable capacity (RAID 6, expandable).
- Component C – All connectivity accessories (cables, transceivers, switch) required to interconnect the new server and both existing Dell PowerEdge R750 servers to both storage units at ≥ 10 Gb/s per path.
- Component D – Network Equipment: two (2) Cisco MDS 9148S 16G Fibre Channel SAN switches (24 active ports each, with On-Demand Port Activation License), one (1) Cisco Catalyst 1300-48P-4X 48-port PoE+ managed switch, and one (1) Cisco Catalyst 9300-48P-E 48-port enterprise stackable switch, all with applicable licenses, per the BOM in Section 6.
- Component E – UPS: one (1) 20kVA / 20kW online double-conversion Uninterruptible Power Supply (APC or approved equivalent) for data centre power protection, per the BOM in Section 7.
- On-site installation, rack mounting, cabling, RAID/pool configuration, SAN zoning, network switch configuration, UPS installation and commissioning, and host mapping for all three (3) servers.
- Integration testing, performance validation, and full handover documentation.
- Multi-year technical support and warranty as specified.
3. Server Minimum Specifications (Quantity: 1 Unit)
The server shall meet or exceed the configuration below. Bidders proposing an alternative brand must include a line-by-line specification equivalence table.
| # | Part No. | Model / SKU | Description | Qty |
|---|---|---|---|---|
| 1 | 0231YFNL | 2288 V8-S8AAF | Server Chassis – 2288 V8 (8×2.5" SAS/SATA Drive Pass-Through Chassis) | 1 |
| 2 | 02313XSF | PAC900S12-B2 | Server Platinum 900W AC Power Supply v2.0 (ST) | 2 |
| 3 | 0253YAEX | BC6515PCPU2U01 | Intel Xeon 6515P (2.3 GHz / 16-Core / 72 MB / 150 W) Processor with 2U Standard Heatsink | 2 |
| 4 | 0251Y287 | M564R32 | DDR5 RDIMM 32 GB, 288-pin, 6400 MHz, 1.1 V, ECC, 2-Rank (2 G×8-bit) | 8 |
| 5 | 0255YEYT | SE006960GV7S1 | SSD 960 GB, SATA 6 Gb/s, Read Intensive, SE006 Series, 2.5-inch | 2 |
| 6 | 0256Y174 | 9560-8i 4G | PCIe RAID Card – 9560-8i 4G | 1 |
| 7 | 0258Y575 | BC16M01PRUKA | Riser Module – 2×8X SLOT (PCIe 5.0) IO1 & IO2 | 1 |
| 8 | 0302Y237 | XC331 | OCP 3.0 Ethernet Adapter – 10 GbE (BCM57416) Dual-Port RJ45, PCIe 3.0 ×8 | 1 |
| 9 | 0405Y017 | XC-0405Y017 | High-Speed Cable – Slimline 2×mini SAS HD, 0.8 m & 0.7 m | 1 |
| 10 | 21243789 | SR_787X43_8X7_5 | Ball Bearing Rail Kit | 1 |
| 11 | 2120Y422 | 2120Y422_DRAEN | Air Duct (2U Radiator) | 1 |
| 12 | 0231Y191 | BC1M22FAN | 8038+ Fan Module | 4 |
| 13 | 04040890 | CC13UK300 | Power Cable – UK AC 250 V/10 A, 3.0 m, C13SF (Wall Plug) | 2 |
| 14 | 0405G019 | CC13EU180 | Power Cord – EU AC 250 V/10 A, 1.8 m, C14SM–C13SF (PDU) | 2 |
| 15 | 88134ULC-700 | 0231YFNL_36M | Super-Care Onsite Standard Technical Support – 2288 V8 – 36 Months | 1 |
Reference platform: Huawei FusionServer Pro 2288 V8 (or equivalent from DELL / HP / Lenovo).
4. Storage System Minimum Specifications (Quantity: 2 Dual-Controller Units)
Each storage unit shall be a dual-controller all-flash NVMe array configured for ≥ 20 TB usable capacity under RAID 6, with at minimum one (1) hot-spare disk, and shall be field-expandable for future capacity growth.
-
Disk Sizing Rationale
| Disk Type | 3.84 TB NVMe SSD |
| RAID Level | RAID 6 (8 data + 2 parity disks) |
| Hot Spare | 1 disk |
| Disks per Unit | 11 disks (8 data + 2 parity + 1 hot spare) |
| Raw Capacity per Unit | 11 × 3.84 TB = 42.24 TB raw |
| Usable Capacity per Unit | ~24 TB usable (8 data disks × 3.84 TB × 0.8 efficiency factor) — exceeds 20 TB minimum |
| Total Disks (2 units) | 22 disks (11 per unit × 2) |
| Expandability | Field-expandable via additional drive enclosures without disruption to live data |
| # | Part No. | Component | Specification | Qty |
|---|---|---|---|---|
| 1 | D3V7N-2C128G-O | OceanStor Dorado 3000 | Dual-Controller All-Flash Array (2U, Dual Ctrl, NVMe, AC/240V HVDC, 128 GB Cache, 8×1 GbE + 8×10 GbE, SPE62C0225, V7) | 2 |
| 2 | V7S4×10GE | SmartIO Module | 4-Port DPU-Based SmartIO I/O Module (SFP+, 10 GbE) – per unit | 2 |
| 3 | D3V7-NVMe3.84 | 3.84 TB NVMe SSD | 3.84 TB SSD NVMe Palm Disk (2.5") – RAID 6, 8 data + 2 parity + 1 hot spare = 11 disks → ~20 TB usable per unit. Field-expandable. | 22 |
| 4 | D3V7-LBS-AllSoftware | SAN License Bundle | SAN Software Bundle: Thin Provisioning, Snap, Replication, Clone, QoS, Erase, DME IQ, Virtualization, Metro, CDP – per unit | 2 |
| 5 | D3V7-LBS-UltraPath | UltraPath SAN | UltraPath SAN Client License – per unit | 2 |
Reference platform: Huawei OceanStor Dorado 3000 V7 (or equivalent from DELL / HP / Lenovo).
The storage units must support direct connectivity (iSCSI or FC at ≥ 10 Gb/s) to: the one (1) new server, and both existing Dell PowerEdge R750 servers.
5. Connectivity Accessories (Minimum 10 Gb/s Throughput per Path)
All accessories required to achieve full host-to-storage connectivity at ≥ 10 Gb/s must be quoted. The table below lists the minimum required items. Bidders must verify compatibility with the proposed server, storage, and existing Dell PowerEdge R750 HBA/NIC ports and include any additional items necessary for a complete, production-ready installation.
| # | Part No. | Item | Description / Purpose | Qty |
|---|---|---|---|---|
| 1 | — | 10/25 GbE SFP+ DAC Cable | Direct Attach Copper (DAC) Cable, SFP+, 10 GbE, 3 m – for server-to-storage links (new server ↔ Storage 1 & Storage 2) | 4 |
| 2 | — | 10/25 GbE SFP+ DAC Cable | Direct Attach Copper (DAC) Cable, SFP+, 10 GbE, 3 m – for existing Dell PowerEdge R750 host links (2× R750 ↔ Storage 1 & Storage 2) | 8 |
| 3 | — | 10 GbE SFP+ Transceiver (SFP+) | 10GBASE-SR SFP+ Optical Transceiver, Multi-Mode, LC Duplex – for storage controller ports (as required per switch topology) | 8 |
| 4 | SN2F02FCPC | OM3 Fibre Patch Cord | Patch Cord DLC/PC–DLC/PC, Multi-Mode OM3, 10 m, 2 mm, Bending-Insensitive – per storage unit (×2 units) | 4 |
| 5 | — | 10 GbE Top-of-Rack Switch | 10 GbE / 25 GbE Managed ToR Switch (minimum 24 SFP+ ports) – to interconnect new server, 2× Dell R750, and 2× storage units at ≥10 Gb/s per path | 1 |
| 6 | — | SFP+ to RJ45 Transceiver | 10GBASE-T SFP+ Copper Transceiver – for existing Dell R750 10 GbE RJ45 HBA ports connecting to the switch (if applicable) | 4 |
| 7 | — | Cat6A Ethernet Patch Cable 3m | Cat6A Shielded Patch Cable, 3 m – management / out-of-band connections for storage controllers | 4 |
| 8 | — | Rack Cable Management (1U) | 1U Horizontal Cable Manager / Lacing Panel – rack tidiness and cable strain relief | 2 |
Note: Bidders must confirm the network topology diagram in the Technical Proposal (Section 8.3), showing all three hosts connected to both storage units with redundant paths.
6. Network Equipment Minimum Specifications
All network equipment must meet or exceed the specifications below. Bidders proposing equivalent models must submit a line-by-line compliance table.
| CISCO MDS 9148S – 16G Fibre Channel SAN Switch (Qty: 2 units) | |||
| Type | Fibre Channel SAN Fabric Switch, 1RU | Form Factor | 1RU rack-mountable, tower-convertible |
| FC Ports | 48 x autosensing FC ports (hardware) | Active Ports | 24 active ports (On-Demand Port Activation License incl.) |
| Port Speed | 16 Gbps per port (autosensing 2/4/8/16G) | Transceiver | SFP+ (16G SW/LW SFP+ transceivers) |
| Fabric Bandwidth | 768 Gbps aggregate switching capacity | OS | Cisco NX-OS |
| HA Features | Dual redundant hot-swap PSU & fans; ISSU (non-disruptive upgrades) | Security | FIPS 140-2; port security; fabric binding |
| SAN Features | VSAN, zoning, PortChannel, FCIP, iSLB | Mgmt | CLI, Cisco DCNM/Nexus Dashboard, SNMP |
| License | On-Demand Port Activation License (12-port increment to activate 24 ports) incl. | Warranty | Minimum 1-year hardware warranty; SMARTnet recommended |
| CISCO CATALYST 1300-48P-4X – Managed PoE+ Switch (Qty: 1 unit) | |||
| Model | C1300-48P-4X | Type | Layer 3 managed switch, 1RU |
| Copper Ports | 48 x 10/100/1000 Mbps PoE+ (802.3af/at) | PoE Budget | 370 W total PoE power budget |
| Uplink Ports | 4 x 10G SFP+ uplinks | Switching Cap. | 104 Gbps switching capacity |
| OS | Cisco IOS Linux-based | L3 Features | Static routing, RIP, OSPF, ACL |
| Security | 802.1X, DHCP snooping, ARP inspection, IP source guard | Management | Web GUI, CLI (SSH/Telnet), SNMP v1/v2c/v3 |
| License | Included (no additional subscription required) | Warranty | Minimum 1-year limited hardware warranty |
| CISCO CATALYST 9300-48P-E – Enterprise Stackable Switch (Qty: 1 unit) | |||
| Model | C9300-48P-E | Type | Layer 3 enterprise stackable switch, 1RU |
| Copper Ports | 48 x 10/100/1000 Mbps PoE+ (802.3af/at) | PoE Budget | 715 W Platinum PSU |
| Uplink Module | Modular uplink slot (10G/25G/40G SFP+ network module) | Stacking | StackWise-480 – up to 8-unit stack, 480 Gbps bandwidth |
| OS | Cisco IOS XE | L3 Features | Full L3 routing; SD-Access ready |
| Security | MACsec AES-256, 802.1X, IBNS 2.0, ETA (Encrypted Traffic Analytics) | Management | Cisco DNA Center, CLI, NETCONF/YANG, SNMP |
| ISSU | In-Service Software Upgrade (non-disruptive) | License | Network Advantage license included |
| Warranty | Minimum 1-year hardware warranty; DNA/C1 support recommended | ||
Note: All switches must be supplied with applicable licenses activated and factory-configured for integration into the data centre environment.
7. UPS Minimum Specifications
The UPS must meet or exceed the specifications below. Bidders proposing an alternative brand (Huawei, Eaton, Vertiv, Emerson, etc.) must include a line-by-line compliance table and current product datasheet.
| UPS – 20 kVA / 20 kW Online Double-Conversion (Qty: 1 unit) | |||
| Reference Model | APC Smart-UPS On-Line SRTG20KXLI (or approved equivalent) | Type | Online double-conversion (VFI), pure sine wave |
| Capacity | 20 kVA / 20 kW | Power Factor | Unity (VA = W) – no derating |
| Input Voltage | 160–285 V single-phase OR 380–415 V 3-phase (user-selectable) | Input Frequency | 40–70 Hz auto-sensing |
| Output Voltage | 220 / 230 / 240 V selectable (default 230 V) | Output Frequency | 50/60 Hz ±4 Hz (±0.1 Hz in battery mode) |
| Form Factor | 7U rack / tower convertible | Transfer Time | Zero (online double-conversion) |
| Battery Type | Sealed VRLA lead-acid (maintenance-free) | Battery Voltage | ±192 V nominal |
| Recharge Time | 4 hours to 90% capacity | Battery Life | 3–5 years expected life |
| Runtime (ext.) | Up to 4 external battery packs for extended runtime | Efficiency | >98% Green Mode; >93.5% online mode |
| Bypass | Internal automatic & manual bypass | EPO | Emergency Power Off (EPO) terminal |
| Management | Pre-installed Network Management Card (SNMP/Web/Modbus) | Connectivity | USB, serial (RJ45), SmartSlot for additional cards |
| Software | PowerChute Network Shutdown (graceful OS shutdown) | Alarms | Audible + visual (LCD display); email/SNMP trap |
| Warranty | 3-year electronics / 2-year battery (minimum) | Standards | IEC 62040-1, IEC 62040-2; CE, UL listed |
Note: UPS must be installed, commissioned, and tested on-site by a certified engineer. Battery runtime test report must be submitted at handover.
8. Technical Proposal Requirements
The Technical Proposal must contain, at minimum:
- Full technical datasheets for each proposed component, mapped line-by-line to the minimum specifications in Sections 3–7.
- Specification equivalence table comparing proposed items against each BOM line item.
- Network connectivity / topology diagram showing how both storage units connect to the new server and both existing Dell PowerEdge R750 servers (redundant paths, VLAN/zoning plan), including SAN fabric layout for the MDS 9148S switches and LAN topology for the Catalyst 1300 and 9300 switches.
- RAID/pool configuration plan: disk count, RAID level, hot-spare policy, usable capacity calculation, and expansion roadmap.
- Installation and commissioning methodology with a project plan and timeline in working days, covering server, storage, network switches (SAN fabric zoning, LAN VLAN configuration), and UPS installation.
- Proof of authorised reseller / partner status for the proposed brand (current certificate or manufacturer letter).
- Minimum two (2) reference projects of comparable scope (server + SAN storage + network switching) completed within the last three (3) years, including client name, value, and contact.
- Warranty and after-sales support plan, including on-site response time, spare-parts availability, and escalation procedures.
9. Financial Proposal Requirements
The Financial Proposal must be submitted in a separate sealed envelope and must include:
- Lump-sum price for each component (A–F) in Annex A, with a detailed cost breakdown attachment for any component requiring itemised sub-pricing.
- Installation and commissioning itemised per task.
- Any additional accessories or consumables not listed but required for a complete installation.
- Prices in RWF.
- VAT shown separately (exclusive and inclusive totals).
- Delivery and commissioning timeline from purchase order issuance.
- Payment terms proposed.
Bidders must complete and submit the Financial Proposal Template in Annex A.
10. Bidder Eligibility Requirements
Bidders must provide:
- Valid RDB Company Registration Certificate.
- Valid Tax Clearance Certificate
- Proof of authorised partnership / reseller status for the proposed brand.
- Minimum two (2) reference letters or signed contracts for similar infrastructure projects completed within the last three (3) years.
11. Bid Evaluation & Selection Criteria
Bids will be evaluated using the following weighted criteria:
| # | Evaluation Criterion | Weight |
|---|---|---|
| 1 | Cost Optimisation – best value, competitive pricing, total cost of ownership | 40% |
| 2 | Technical Specification Compliance – meeting or exceeding minimum specs stated in Sections 3–7 | 30% |
| 3 | Technical Experience – proven track record in comparable server & storage projects | 10% |
| 4 | Brand Partnership – valid authorised reseller / partner certificate for proposed brand | 10% |
| 5 | After-Sales Support & Warranty – SLA response time, warranty terms, local support | 5% |
| 6 | Delivery Timeline – ability to deliver and commission within agreed schedule | 5% |
| TOTAL | 100% |
The Companies reserve the right to request clarifications, conduct site visits, or seek additional information during the evaluation process.
12. Submission Requirements
Bidders must submit:
- One (1) sealed envelope containing: Technical Proposal + all eligibility documents.
- One (1) sealed envelope containing: Financial Proposal (completed Annex A).
- Both envelopes inside one outer sealed envelope, clearly labelled:
| Prime Life Insurance Ltd & Prime Insurance LtdMIC Building, KN2 Av, Kigali – Rwanda | Second FloorTel: 0788 150 100 | Toll-free: 1320 | info@prime.rw Tender Ref: 003/PLI/PI/ICT/OT/2026/INFSupply, Delivery & Installation of ICT Infrastructure | 003/PLI/PI/ICT/OT/2026/INFDO NOT OPEN BEFORE: 29/05/2026 @ 15:30 |
13. Clarifications
All clarification requests must be submitted in writing no later than 27/05/2026 to:
Dieudonné UWAMBAJIMANA
Email: dieudonne.uwambajimana@prime.rw | Tel: 0786 138 376
Prime Insurance Ltd and Prime Life Insurance Ltd (hereinafter referred to as “the Companies”) reserve the right, at their sole and absolute discretion, to accept or reject any bid, in whole or in part, without assigning any reason, and to annul the tender process at any stage prior to contract award. This statement forms an integral and binding part of the referenced open tender, and submission of a bid shall constitute full and unconditional acceptance of all terms and conditions herein. The Companies further reserve the right to cancel the tender at any time before award without liability or obligation to compensate bidders for any costs incurred, to postpone, suspend, or extend the bid submission deadline with or without prior notice and for any reason, to re-issue the tender in whole or in part under the same or revised terms, and to phase the implementation of the awarded scope across the 2026 and 2027 financial periods, subject to budget availability, internal approvals, and operational requirements at the time of award.
| _______________________________Col (Rtd) Eugene M. HAGUMAChief Executive OfficerPRIME INSURANCE LTD | _______________________________HABARUREMA InnocentChief Executive OfficerPRIME LIFE INSURANCE LTD |